← All Indian IPOs

Karamtara Engineering Limited

Open now
NSE Mainboard

9–11 Sep 2026

Expected Allotment 15 SepRefund 16 SepListing 17 Sep
Price band ₹241–₹254
GMP+23.6%₹60 · 1 src
Subscribed
Min to apply (retail) ₹14,986 59 shares, one lot at the cap
↓ Download IPO analysis PDF

Updated 2026-09-09 (IST)

Offer document (RHP) ↗not cross-checked

What Karamtara Engineering Limited does

We are a backward integrated manufacturer of products for renewable energy and transmission lines sectors. We are the largest integrated manufacturer in terms of installed capacity in India for solar mounting structures and tracker components in Fiscal 2026 according to the F&S Report.

EBITDA margin
11.6%
Debt / Equity
0.84x
OFS share
23%
[+] Profit backed by cash: Operating cash flow is 295% of profit after tax — earnings are cash-backed.
[+] Strong revenue growth: Revenue compounded 33% a year over 2 years. Revenue compounding above 20% a year.

Karamtara Engineering Limited financials

Rs crore  ·  Annual

Latest year highlighted in green. Sparklines show the trend.

202420252026
Sales 2,4253,1584,312
Operating Profit 263347498
OPM % 10.8%11.0%11.6%
Net Profit 103139229
Total Debt 5095561,030

Karamtara Engineering Limited IPO offer structure

Fresh issue 77% Offer for sale 23%

Total: ₹875 cr. Fresh issue proceeds go to the company; OFS proceeds go to selling shareholders.

Issue size and split come from a public aggregator rather than the exchange, cross-checked against a second one. The offer document states the offer-for-sale as a share count against a blank amount, so it cannot be read from the document itself.

Use of proceeds

Karamtara Engineering Limited promoters and holding

Karamtara Engineering Limited strengths and risks

Company-stated strengths and disclosed risk factors from the offer document.

Strengths
  • Largest integrated manufacturer in India for solar mounting structures and tracker components (p.248)
  • Diverse product offerings acting as a one-stop shop for solar structures (fixed-tilt and trackers) (p.248)
  • Extensive global footprint with a track record of exports to over 50 countries (p.249)
  • Established relationships with global customers and high customer retention (p.250)
  • Strategic network of manufacturing facilities with advanced capabilities (p.251)
Risks
  • We are significantly dependent on our manufacturing facilities, and any disruption could adversely affect our business. (p.24)
  • We derive a substantial portion of our revenue from the sale of products in the solar industry. (p.26)
  • We depend on certain key customers for a significant portion of our revenues. (p.26)
  • We derive a significant portion of our revenue from operations from exports, exposing us to foreign jurisdiction risks. (p.28)
  • Our Company, Directors, and KMPs may be subject to warnings, show-cause notices, or penalties from regulatory inspections. (p.29)

Karamtara Engineering Limited peer comparison: DRHP median P/E 19.6x

Live BSE prices
Company CMP P/E OPM% ROE% Source
Inox Wind Limited Rs 75.6 +0.2% 31.3x 21.3% 23.8% live
Waaree Energies Limited Rs 2,575 -0.8% 18.5x 19.8% 79.4% live
KP Green Engineering Limited Rs 279.75 +0.1% 9.7x live
Suzlon Energy Limited Rs 45.44 -0.2% 19.9x 17.5% 104.8% live
Premier Energies Limited Rs 987.25 -0.2% 26.8x 31.7% 8.6% live
Vikram Solar Limited Rs 169.25 +2.0% 17.2x 8.9% live
Saatvik Green Energy Limited Rs 414.45 -1.3% 21.3x 5.0% live
Emmvee Photovoltaic Power Limited Rs 331.2 +1.8% 18.0x 25.6% live

P/E from offer document where live data unavailable. Not a fair-value judgement.

Karamtara Engineering Limited market and competition

We are the largest integrated manufacturer in terms of installed capacity in India for solar mounting structures and tracker components in Fiscal 2026 according to the F&S Report.

Karamtara Engineering Limited outlook, as the document states it

We intend to undertake capacity expansion to enhance our existing production capabilities, including setting up a new structural steel profile manufacturing facility in Taluka Bhachau, Kutch, Gujarat by Fiscal 2027. We also intend to set up a new manufacturing facility in Tarapur, Palghar, Maharashtra to produce solar stamping parts in Fiscal 2027.

Karamtara Engineering Limited IPO: common questions

When does the Karamtara Engineering Limited IPO open and close?

The Karamtara Engineering Limited IPO is open from 9 Sep 2026 to 11 Sep 2026.

What is the Karamtara Engineering Limited IPO price band?

The price band is ₹241–₹254 per share.

What is the lot size and minimum investment for the Karamtara Engineering Limited IPO?

One lot is 59 shares, and a retail application must be at least one lot. That is about ₹14,986 at the upper end of the band. An HNI application starts above Rs 2 lakh, so the minimum is higher for that category.

What is the grey-market premium (GMP) for the Karamtara Engineering Limited IPO?

As of 9 Sep 2026 the indicative GMP is +23.6%. GMP is unregulated and self-reported. Never decide on it alone.

When are the Karamtara Engineering Limited IPO allotment and listing dates?

Not published yet. Derived from the close date on the usual timetable: allotment around 15 Sep 2026, refund/unblock around 16 Sep 2026 and listing around 17 Sep 2026. Treat these as estimates until the exchange confirms them.

How do I apply for the Karamtara Engineering Limited IPO?

Through any broker app or your bank's net banking, using a demat account and a PAN. You bid in lots at a price inside the band, or at cut-off. The money is blocked in your account, not debited, until allotment. One application per PAN. We do not recommend brokers and carry no broker links. How to apply, start to finish →

Sources & method

Subscription and issue data come from the NSE and BSE exchange feeds, with the third-party aggregator, clearly labelled, where an exchange feed is unreachable. DRHP analysis is extracted from the offer document itself, every figure cited to its page. Each figure on the page carries its source and its timestamp.

Grey-market premium (GMP) is unregulated.

Every GMP figure is a self-reported grey-market estimate. No exchange, regulator or clearing body records or audits it, and there is no settlement guarantee or recourse. Shown for context only; never decide on GMP alone. New to GMP? The 30-second explainer → Has GMP actually been right? →

How often do these actually open above the issue price?

Of the 505 mainboard IPOs that have listed on the NSE since 2003, 359 (71%) opened above their issue price, at a median of +10%. That is the segment's own record, not a forecast for this issue.